GCS has undertaken considerable renovation works in Shanghai and has invested in more production and storage capacity.
The surface area of the factory has been increased to 1,000 square metres by extending the current storehouse and technical facilities. A new, larger quality lab has also been built close to the production area, with the latest measurement and quality control equipment.
In addition, a new high-capacity crane has been installed for lifting heavy moulds. GCS Shanghai facility is now equipped with cutting edge technologies, including bi-injection tooling.
Source: Global Closure Systems
© FoodBev Media Ltd 2024