The boiler plant will generate the steam and heat needed by Valio’s Lapinlahti milk processing plant. The plant will be fuelled by wood chips and peat. Wood chips can eventually be used at 100%, but in the initial stage they will account for 50–60% of the fuel mix. The objective is to increase this share gradually.
Technical manager, Esa Mäkipelto from Valio, said: “Valio is investing in the development of its energy generation structure and in the recovery of waste energy streams with the goal of improving energy efficiency, achieving lower emissions and increasing its use of domestic fuels. The use of domestic fuels will also benefit other players in the area.”
Product line director, Olli Elo from MW Power, said: “When designing the plant, particular attention was paid to ensuring high plant availability and flexibility and securing the operations of the production plant under any circumstances in a changing fuel market. Replacing the old boiler with a new, modern biomass-fired boiler will also significantly increase the efficiency of steam generation.”
Source: Valio’s Lapinlahti
© FoodBev Media Ltd 2024